Installation of the Year

Medifloor and Forbo Flooring Systems

To eliminate the need for lowering the raised-access floor, Medifloor mounted the transition profiles direct to the raised-access panels using templates to create accurate consistent curves at all corners. Lino was installed to the large T-point area and clad vertically around all columns with welded vertical corners 3m in height. Flotex Grass was used for the conference room with Ted Todd timber used to create tiered seating with access hatches.