Fast-track smoothing underlayments

John discusses innovations around smoothing underlayments, a product category that’s seen particular advancements to help contractors install floorcoverings as quickly as possible in certain situations.

FLOORING contractors installing floorcoverings as part of a refurbishment will often find old adhesive residues on the removal of floorcoverings. Additionally, installations frequently face increasing time pressures. Smoothing underlayments are one product category that’s seen particular advancements in order to help flooring contractors install floorcoverings as quickly as possible in such situations. Here I’ll discuss the latest innovations.

Many recent developments in smoothing underlayments have been intended to speed up the subfloor preparation process, to help flooring contractors under ever-increasing pressure to work to shorter timescales, without compromising on finished results.

The fastest-drying smoothing underlayment on the market is walk-on hard from just 30 minutes and is ready to receive floorcoverings in as little as 45 minutes after application. It’s suitable for use over a wide range of subfloor types, including sand/cement screeds, concrete, and waterproof surface membranes. In common with most other smoothing underlayments, however, it requires the subfloor to be free of contaminants, including old adhesive residues, prior to application.


Adhesive residues
Another innovation that has sped up subfloor preparation is the formulation of smoothing underlayments that can be applied directly over old adhesive residues, removing the need to spend valuable time mechanically removing them. Such products are formulated to minimise the stresses inflicted on adhesive residues as the smoothing underlayment sets, meaning it’s able to maintain its integrity when applied to subfloors where these are still present.


In most cases, there’s no need to apply a primer beforehand, saving further time and expense. The best of these smoothing underlayments are usually able to accept foot traffic about one hour after application and are ready to receive new floorcoverings from about four hours later. They also have the benefit of allowing contractors to use the same product in situations where newly installed subfloors and areas with old adhesive residues present are next to each other.


New formulations
The latest advancements in technology have enabled F Ball to create a fast-track, water-mix smoothing underlayment that can be applied over old adhesive residues, Stopgap 1500 AquaPro.
Such products have previously only been available in bag-and-bottle formulations.


The new smoothing underlayment is suitable for preparing a wide range of sound internal subfloors prior to the installation of new floorcovering and can be applied over bitumen, carpet tile tackifiers and ceramic tile adhesives, eliminating the need for mechanical preparation.


Just as with market-leading bag and bottle versions, the product is walk-on hard in as little as 60 minutes after application and ready to receive floorcoverings from just four hours. As a water-mix smoothing underlayment, no bottle is required, meaning less plastic waste is produced by the flooring industry.


Prior preparation
Before a smoothing underlayment is applied, contractors should begin any flooring installation by ensuring the subfloor is suitably sound, smooth, and dry enough for the receipt of new floorcoverings. This may necessitate repairs to the subfloor or the removal of surface contaminants, excluding old adhesive residues when using a smoothing underlayment that can be applied directly over the top.


F Ball recommends a moisture test is then conducted to determine subfloor moisture levels. Where a moisture test indicates that the relative humidity (RH) level within the subfloor is above 75% (65% if wood floorcoverings are to be installed), a waterproof surface membrane will be required to prevent floor failure.


After these steps have been undertaken, the application of an appropriate smoothing underlayment is the final stage in the subfloor preparation process before new floorcoverings can be installed.
www.f-ball.co.uk
John Green is F Ball technical service officer